Find Products
Review our dynamic collection
Coating System
Concrete/Cement Floor | ||
---|---|---|
Type | Product Name | No. of Coat(s) |
Sealer / Primer | Nippon Paint Penetrative Epoxy Primer/ Nippon Paint EA9 Finish HB | 1 coat |
Topcoat | Nippon Paint EA7 Finish | 2 coats |
Steel | ||
---|---|---|
Type | Product Name | No. of Coat(s) |
Sealer / Primer | Nippon EA9 Red Oxide Primer | 1 coat |
Topcoat | Nippon EA7 Finish | 2 coats |
Tiles / Ceramic Surfaces | ||
---|---|---|
Type | Product Name | No. of Coat(s) |
Sealer / Primer | Nippon Paint Tile Primer / Nippon Paint EA9 Finish HB | 1 coat |
Topcoat | Nippon EA7 Finish |
Application Data
Application
Brush, Roller, Airless Spray, Compressed Air Spray
Thinning
Thin up to 10% by volume of SA-65 Thinner
Touch Dry / Hard Dry
3 - 4 hours (Dependent on temperature and humidity) / 16 hours (Dependent on temperature and humidity)
Recoating Interval
Minimum 16 hours (Dependent on temperature and humidity)
Theoretical Coverage
9.0 m2 per litre per coat (for dry film thickness of 50 microns) | 5.6 m2 per litre per coat (for dry film thickness of 80 microns)